
Standard Repair Times
Procedure Number and Description
Removed
From
Chassis
RABCD
Special
S
In-Chassis
Service Accessibility Codes
37
25−1AA MAIN ROTOR − REMOVE AND INSTALL
Step 1 Includes: −−1.5 −− −
Disconnect/reconnect:
− Battery
− Wire harnesses as necessary
− Generator leads
Remove/install:
− Rotor assembly
Test run unit
25−1AB MAIN STATOR − REMOVE AND INSTALL
Step 1 Includes: −−1.5 −− −
Disconnect/reconnect:
− Battery
− Wire harnesses as necessary
− Generator leads
Remove/install:
− Stator assembly
Test run unit
25−3AE OUTPUT LEAD TERMINAL BLOCK −
REPLACE
Step 1 Includes: −−0.5 −− −
Disconnect/connect:
− Battery
− Leads on reconnect block
Remove/install reconnect block
25−3AF END BELL/BEARING CARRIER − REPLACE
Step 1 Includes: −−1.0 −− −
Disconnect/reconnect:
− Battery cables
− Wire harnesses as necessary
Remove/install:
− Generator end bell
Test run unit
Comentarios a estos manuales